Dimensions Engineers & Architects PVT. LTD.

We DACS have a vast experience for Steel Structural Design for Diversified nature of jobs like the Design Of Steel PEB (Pre-Engineered Building) Structure for various industrial Projects, Steel Canopy together with RCC Structure Design for M/s., LASMO OILS PAKISTAN LTD, PAKISTAN STATE OIL CO, FOSTER WHEELER PETROLEUM DEVELOPMENT COMPANY (FWPD), SHELL PAKISTAN LIMITED, on steel TC Buildings, PC Buildings, Canopy & Civil/ structural design and subsequently Construction execution of Permanent camp Buildings and various retail outlet projects, (Completion Certificate attached herewith in Copy with the brochure, we also have experience of working out meticulous details of retail outlets of Diversified Nature in terms of their Design and Detailed Supervision of construction execution) for Pakistan State Oils Company Ltd as detailed below:

1)-������� New Development Sites (New Buildings as New Vision Outlets)

2)-������� Ground Up Sites Altogether Modified Design of Existing to New Vision Outlets)

3)-������� Conversion Sites (Design with minimum possible modifications of Existing to New Vision Outlets)

4)-������� Detailed Site Supervision

We have the honor of having completed all the jobs assigned to our firm right in time, with a strict and consistent adherence to Quality and Time Stipulations since commencement till completion of the projects. The Time Frame is 75 days to N.D Sites and 45 days to Conversion Sites which itself is a challenge.

We have already rendered, and have a vast experience of rendering Turnkey Basis Construction Services ranging Architectural, Civil Design and Construction execution and Interior works on the similar nature of projects. It is worth mentioning that we have handled the similar nature Turn-key project for M/s., Yousaf Weaving Mills (Chakwal Group) at Pattoki.